GENEVA PRODUCTION TUNISIA – Tunis, Tabarka

Productive power & Competitiveness

The Group's first subsidiary created in 2002, the Fouchana site located 20 km from Tunis has developed multi-technology know-how, and more particularly highly competitive skills in the assembly and wiring of parts and sub-assemblies. The Tabarka site strengthens the capacity power. Equipped with all the Group's business and engineering expertise, LEMAN Industrie Tunisie is able to respond to any type of project, with controlled production capacities and costs.

Productive capacities

  • Centralized R&D unit
  • 40 cutting presses (20 to 400T) including some for deep drawing
  • 17 Injection presses (35 to 200T)
  • 5 robotic lines
  • Automated assembly lines